EDUCATIONAL ATTAINMENT

 

B.E in Electrical Engineering

Mehran University of Engineering Technology Jamshoro Hyderabad Pakistan

Year 2001 (with 3rd Position in Final Year).

 

TRAININGS

Long Training for Assistant Engineers(P&I) (32 weeks)

Arranged by    : WAPDA Pakistan

Location          : GSO Training Center Terbella and TSG Lahore Pakistan

Description     : Testing, Commissioning and Maintenance of Protection & Instrumentation of    Sub Station.

 

COMPUTER SKILLS

Ability to work on all windows based software’s, installation and Trouble Shooting. Example:- MS Office all versions, Windows all versions etc.

 

WORK EXPERIENCE

 

            Testing and Commissioning of all kinds of Sub Stations according to Saudi Electric Company Standard.

 

Protection Engineer  (Mar 2008 to Date)

Commissioning Services Dept:

Saudi Electric Company

Eastern Operating Area(SEC-EOA)

Dammam  Kingdom Saudi Arabia.

 

Commissioning Engineer (Dec 2005 to Mar 2008)

ThyssenKrupp Xervon.

Plant Services.

P.O Box 75328, Al Khobar 31952

Kingdom of Saudi Arabia.

 

Assistant Engineer (P & I)           (May 2003 to Dec 2005)

WAPDA Pakistan

HESCO HQ Hussainabad

Hyderabad Pakistan.

 

Protection Engineer(Mar 2008 to Date)

Commissioning Services Dept:

Saudi Electric Company

Eastern Operating Area(SEC-EOA)

Dammam  Kingdom Saudi Arabia

www.se.com.sa

 

Duties & Responsibilities:

 

·         Witnessing and Monitoring of Testing activities in the Project.

·         Preparation of Project Reports, Punch Lists, Schedules, and strict implementation of Standards.

·         Engineering & Design reviews of Protection Schemes and modifications of all kinds of Protection Schemes.

·         Implementation of international standards, site approvals of control and protection devices and all type of switchgear.

·         Testing & Commissioning activities of all kind of Distance Relays, Bus Bar Protection Relays, over Current Relays, Auto Re-closure Relays, Under Frequency Relays, Synch: Check Relays, Under Voltage Relays, SCADA system and their Schemes in New and Existing Sub Stations.

·         Scheme & Wiring Check of All kinds Panels and Modifications According to SEC standards.

·         Preparation of As built Drawings and Other commissioning activities.

 

 

Projects Completed :

 

1.     Testing and Commissioning of 115Kv Al Fursan near Dammam Air Port SEC-EOA KSA. Project included Installation of New GIS. Reinforcement of existing Transmission System. 

2.     Testing and Commissioning of 132Kv New Al Jouf Substation at Al Jouf Power Plant SEC-EOA KSA. Project included Installation of New GIS. Reinforcement of existing Transmission System.

 

Commissioning Engineer (Dec 2005 to Mar 2008)

ThyssenKrupp Xervon.

Plant Services.

P.O Box 75328, Al Khobar 31952

Kingdom of Saudi Arabia.

www.thyssenkrupp.com

 

Duties & Responsibilities:

Testing & commissioning of Sub-Station from 13.8 KV to 380 kV activities include, 

1.     Testing & Commissioning of all kind of Protective Relays & Auxiliary Relays used for signaling Monitoring and Interlocking etc. 

2.     Scheme & Wiring Check of All kinds Panels and Modifications According to SEC standards. 

3.     Preparation of As buit Drawings and Other commissioning activities.

 

Projects Completed :

                                                 

3.     Testing and Commissioning of 132/13.8 Kv Substation 8123 Old Badia SEC-EOA Riyadh KSA. Project included Installation of New GIS. Installation of New UGF and Transformers.(project under progress) *project Executed as Sub-Contractor for VATECH Siemens 

4.     Testing and Commissioning of 132/13.8 Kv Substation 8703 Dilam SEC-EOA Al-Kharj KSA. Project included Installation of New GIS, 9 Bays and De-commissioning of Old GIS system. Addition of New T.Lines and modifications is Existing Transformer Distribution System.  *project Executed as Sub-Contractor for VATECH Siemens 

5.     Testing and Commissioning of Reinforcement Project for 230/69/13.8 Kv Ibn Khaldoon BSP Dammam KSA for SEC-EOA* . Project include Addition 69 Kv Bays, and Addition of 250 MVA Tramsformer, Addition of 13.8 Kv feeders. *project Executed as Sub-Contractor for N.C.C 

6.     Testing and Commissioning of New 230/13.8 Kv Substation at HNRP Hawiayah KSA for Saudi Aramco*. Project included New ½ Breaker Scheme Bays with  Transformers and Lines Bays.   

7.     Modification at other 2 ends of 230/13.8 kV substations at HBSP and HGP for SEC-EOA* due to addition of HNRP Hawiayah as Mentioned Above. Project included installation Devices and Modification in old protection schemes. This project was coupled with above. 

8.     Testing and commissioning of New 132/13.8 kV substation at Al-zaharat Al-Badia Riyadh KSA for SEC-COA*. Project included testing and commissioning of Transformer and 132 Kv Bays. *project Executed as Sub-Contractor for N.C.C.

 

 

Detail Of Protective & Auxiliary Relays :- 

ü  Over Current Relays:

SIEMENS(7SJ602 7SJ611 and others), ABB(REJ ,SPAJ etc), Areva(P142 etc). 

ü  Distance Relays:

SIEMENS(7SA522 v 4.6 etc) ABB(REL 531 ver 2.5 etc) Areva P442 etc 

ü  Diff: and Line Diff: Relays:

SIEMENS 7SD522 ,7UT512 & 7UT612 G.E(Multilin 745 etc) ABB (REL 561 & RET 521 ver 2.5,RADSB etc ) and others. 

ü  High impedance Bus bar Diff:

ABB (RADHA, RADHD etc ) and REYROLLE (DAD ) and others. 

ü  Over and Under voltage relays:

All kinds of relays ABB, SIEMENS and AREVA. 

ü  Under and over freq:

all kinds of relays ABB, SIEMENS and AREVA.. 

ü  Auxiliray Relays

All kind of ABB and Others. 

ü  SCADA System Testing & Interface

All kind of ABB and Others.

 

 SOFTWARE USED

 

  • SIEMENS DIGSI: Ver 4.6 sp-2.
  • Areva MiCOM 2.14. 
  • GE PROGRAMMA FREJA WIN: FREJA 300.Ver 5.1 etc used for testing relays
  • ABB CAP 540.

Other software for different testing equipments.

 

Assistant Engineer (P & I) (May 2003 to Dec 2005)

WAPDA Pakistan

HESCO HQ Hussainabad

Hyderabad Pakistan.

www.hesco.gov.pk

 

Duties & Responsibilities:

1.     Testing & commissioning of 132/66/11 kV sub-stations, including testing of Protection Schemes, Control, Metering, Power Transformers & LV / MV switchgears.

 2.     Insure Stability of 220/132/66/11 kV supply on 45 Grid stations in Sukkur region Sindh Pakistan 

3.     Periodic Testing, Maintenance and Troubleshooting.

 

Techinical Experance:-

 

1.     Testing and commissioning of Line Protection schemes According to SEC-EOA and SEC-COA Standards. 

2.     Testing and commissioning of  Bus Bar Stability and Sensitivity According SEC-EOA and SEC-COA Standards. 

3.     Testing and commissioning of Transformer Protection Schemes According to SEC-EOA and SEC-COA Standards. 

4.     Testing and commissioning of  CTs all kinds and Primary Injection of CT circuit. 

5.     Testing and commissioning of VT all kinds. 

6.     Secondary Injection of CT and VT Circuit. 

7.     Testing and commissioning of AC and DC system of Substation.

  

PERSONAL DETAILS

DOB: -                                      01 Jan  1978

Nationality                                 Pakistani

Material Status                           Married

email:                                      mjakhro@gmail.com

CHARACTER REFERENCES

 

Mayeen Ul Ahsan                       

General Manager  

MIIS ThyssenKrupp                     

P.O.Box 75328.Al Khobar 31952 

Kingdom of Saudi Arabia

Cell. No. +966 (50) 5201428

 

 

Amir Ali Zaidi                               MIIS Thyssenkrupp

Dept: Manager                             P.O. Box 75328, Al Khobar 31952

Field services                               Kingdom of Saudi Arabia

                                                  Cell. No:+966 (50) 5618236

 

R. Kumar                                     National Contracting Company(NCC)

Country Manager(Testing)              Al-Khubar Kingdom of Saudi Arabia

                                                  Cell. No:+966 55 3335860  

free templates
Make a Free Website with Yola.